Transport logistics
E-mobility in transport logistics. Better and more sophisticated solutions with Eponet.
- Hugelshofer Logistik AG - 8500 Frauenfeld
- Dreier AG Transporte Logistik - 4622 Egerkingen
- Blöchlinger AG - 8732 Neuhaus SG
- Anton Häfliger AG - 6210 Sursee
- F. Stuber Transporte AG - 6343 Rotkreuz
- Hasler Transport AG - 8570 Weinfelden
- DB Schenker - 8422 Pfungen
Hugelshofer Logistik AG - 8500 Frauenfeld
Administration and billing solution with load management
Project description:
Creation of a charging park with a new transformer station and 58 charging points, expansion of the staff underground car park, integration of existing charging stations
28x DC charging points Kostad 360 kW
30x AC charging points Kostad / Raedian 22 kW / Mennekes 22 kW
Eponet GLM3 load management from transformer station
Peak shaving
Public charging with QR code and Hubject roaming. RFID charging with billing (Eponet roaming)
Completion in 2024
Impressions:
Dreier AG Transporte Logistik - 4622 Egerkingen
Administration and billing solution with load management
Project description:
Creation of Egerkingen charging park with new transformer station and DC & AC charging points. Load management at two locations in Egerkingen. Administration and billing for Oberentfelden and Suhr locations
Various DC charging points Siemens, Kostad, Temes
Various AC charging points Volvo Garo 43kW / Etrel 22kW
Eponet Load management from transformer station
Peak shaving
Completion in 2024 / Expansion underway (as of April 2025: 25 charging points at 4 locations)
Impressions:
Blöchlinger AG - 8732 Neuhaus SG
Administration and billing solution with load management
Project description:
Creation of charging park with transformer station and 4 DC charging points
4x DC charging points Kostad 360 kW
Eponet GLM3 Load management from transformer station
Peak shaving
Completion in 2024
Impressions:
Anton Häfliger AG - 6210 Sursee
Administration and billing solution with load management
Project description:
Creation of Sursee charging park with DC & AC charging points. Load management.
Administration and billing
2x DC charging points Kostad 360 kW
2x AC charging points Kostad 43 kW
Eponet GLM3 Load management
Peak shaving
Completion in 2024
Impressions:

Peak shaving Eponet GLM3
Image left side before / right side after peak shaving with GLM3. The set maximum value in kW is no longer exceeded.
F. Stuber Transporte AG - 6343 Rotkreuz
Administration and billing solution
Project description:
Creation of Rotkreuz charging park with 26 DC and AC charging points.
Administration and billing
10x EVTEC DC charging points with up to 384 kW
16x Autel 22 kW AC charging points
Completion in 2024 / Expansions in 2025
Impressions:
Hasler Transport AG - 8570 Weinfelden
Administration and billing solution with load management, smart metering, RFID extension
Project description:
Creation of Weinfelden charging park with DC charging points.
Administration and billing
Eponet GLM3 load management
Eponet RFID reader for charging stations without RFID function
Peak shaving
Smart metering for ZEV
2x DC charging points EVTEC 250kw
Completion in 2025
Impressions:
DB Schenker - 8422 Pfungen
Administration and billing solution with load management
Project description:
Creation of DC and AC charging points, Plug'n Charge function at Heliox dispenser charging stations
2x DC charging points Siemens SiCharge 360 kW
3x DC charging points Heliox Flex 180 kW
3x AC charging points Easee Charge 22 kW
Eponet GLM3 load management
RFID charging with billing (Eponet Roaming)
Completion in 2025
Impressions:
Pictures taken during commissioning – barrier tape in place as the site had not yet been opened to the public at the time the photo was taken.