Transport logistics

E-mobility in transport logistics. Better and more sophisticated solutions with Eponet.

Hugelshofer Logistik AG - 8500 Frauenfeld

Administration and billing solution with load management

Bildschirmfoto 2025-04-01 um 14.01.37.jpg

Project description:

Creation of a charging park with a new transformer station and 58 charging points, expansion of the staff underground car park, integration of existing charging stations

28x DC charging points Kostad 360 kW
30x AC charging points Kostad / Raedian 22 kW / Mennekes 22 kW
Eponet GLM3 load management from transformer station
Peak shaving

Public charging with QR code and Hubject roaming. RFID charging with billing (Eponet roaming)

Completion in 2024

Impressions:

Bildschirmfoto 2025-04-01 um 13.57.19.jpg

Bildschirmfoto 2025-04-01 um 13.56.24.jpg

Bildschirmfoto 2025-04-01 um 13.56.57.jpg

Bildschirmfoto 2025-04-01 um 13.59.54.jpg

Bildschirmfoto 2025-04-01 um 14.00.51.jpg

Bildschirmfoto 2025-04-01 um 14.00.41.jpg

Bildschirmfoto 2025-04-01 um 14.01.01.jpg

Bildschirmfoto 2025-04-01 um 14.10.54.jpg

Bildschirmfoto 2025-04-01 um 15.55.24.jpg

Bildschirmfoto 2025-04-01 um 14.01.17.jpg

Bildschirmfoto 2025-04-01 um 13.58.30.jpg

Dreier AG Transporte Logistik - 4622 Egerkingen

Administration and billing solution with load management

Bildschirmfoto 2025-04-01 um 15.34.02.jpg

Project description:

Creation of Egerkingen charging park with new transformer station and DC & AC charging points. Load management at two locations in Egerkingen. Administration and billing for Oberentfelden and Suhr locations

Various DC charging points Siemens, Kostad, Temes
Various AC charging points Volvo Garo 43kW / Etrel 22kW
Eponet Load management from transformer station
Peak shaving

Completion in 2024 / Expansion underway (as of April 2025: 25 charging points at 4 locations)

Impressions:

Bildschirmfoto 2025-04-01 um 15.49.16.jpg

Bildschirmfoto 2025-04-01 um 15.42.46.jpg

Bildschirmfoto 2025-04-01 um 15.43.11.jpg

Bildschirmfoto 2025-04-15 um 08.58.55.jpg

Bildschirmfoto 2025-04-01 um 15.52.53.jpg

Bildschirmfoto 2025-04-01 um 15.42.04.jpg

Bildschirmfoto 2025-04-01 um 15.41.35.jpg

Blöchlinger AG - 8732 Neuhaus SG

Administration and billing solution with load management

Bildschirmfoto 2025-04-01 um 16.04.51.jpg

Project description:

Creation of charging park with transformer station and 4 DC charging points

4x DC charging points Kostad 360 kW
Eponet GLM3 Load management from transformer station
Peak shaving

Completion in 2024

Impressions:

Bildschirmfoto 2025-04-01 um 16.02.47.jpg


Bildschirmfoto 2025-04-01 um 16.03.06.jpg

Bildschirmfoto 2025-04-01 um 16.04.14.jpg

Bildschirmfoto 2025-04-01 um 16.03.38.jpg

Bildschirmfoto 2025-04-01 um 16.03.52.jpg

Bildschirmfoto 2025-04-01 um 16.04.04.jpg

Anton Häfliger AG - 6210 Sursee

Administration and billing solution with load management

Bildschirmfoto 2025-04-08 um 15.43.22.jpg

Project description:

Creation of Sursee charging park with DC & AC charging points. Load management.

Administration and billing

2x DC charging points Kostad 360 kW
2x AC charging points Kostad 43 kW
Eponet GLM3 Load management
Peak shaving

Completion in 2024

Impressions:

Bildschirmfoto 2025-04-08 um 15.48.33.jpg

Bildschirmfoto 2025-04-08 um 15.47.57.jpg

Bildschirmfoto 2025-04-08 um 15.45.40.jpg

Bildschirmfoto 2025-04-08 um 15.47.20.jpg

Bildschirmfoto 2025-04-08 um 15.56.22.jpg

 

Peak shaving Eponet GLM3

Image left side before / right side after peak shaving with GLM3. The set maximum value in kW is no longer exceeded.

Eponet LM Peak Shaving.jpg

F. Stuber Transporte AG - 6343 Rotkreuz

Administration and billing solution

1735814957789.jpg

Project description:

Creation of Rotkreuz charging park with 26 DC and AC charging points.

Administration and billing

10x EVTEC DC charging points with up to 384 kW
16x Autel 22 kW AC charging points

Completion in 2024 / Expansions in 2025

Impressions:

Bildschirmfoto 2025-04-08 um 16.01.06.jpg

1735814957806.jpg

1735814958005.jpg


1735814957879.jpg

1735814957791.jpg

Bildschirmfoto 2025-07-08 um 09.49.29.jpg

Hasler Transport AG - 8570 Weinfelden

Administration and billing solution with load management, smart metering, RFID extension

Bildschirmfoto 2025-05-20 um 14.53.02.jpg

Project description:

Creation of Weinfelden charging park with DC charging points.

Administration and billing
Eponet GLM3 load management
Eponet RFID reader for charging stations without RFID function
Peak shaving
Smart metering for ZEV

2x DC charging points EVTEC 250kw

Completion in 2025

Impressions:

Bildschirmfoto 2025-05-20 um 14.48.17.jpg

Bildschirmfoto 2025-05-20 um 14.59.11.jpg

Bildschirmfoto 2025-05-20 um 14.59.22.jpg

Bildschirmfoto 2025-05-20 um 14.58.50.jpg

Bildschirmfoto 2025-05-20 um 14.48.36.jpg

 

DB Schenker - 8422 Pfungen

Administration and billing solution with load management

Bildschirmfoto 2025-06-06 um 11.24.27.jpg

Project description:

Creation of DC and AC charging points, Plug'n Charge function at Heliox dispenser charging stations

2x DC charging points Siemens SiCharge 360 kW
3x DC charging points Heliox Flex 180 kW
3x AC charging points Easee Charge 22 kW
Eponet GLM3 load management 

RFID charging with billing (Eponet Roaming)

Completion in 2025

Impressions:

Bildschirmfoto 2025-06-06 um 11.29.29.jpg

Pictures taken during commissioning – barrier tape in place as the site had not yet been opened to the public at the time the photo was taken.

Bildschirmfoto 2025-06-06 um 11.29.48.jpg

Bildschirmfoto 2025-06-06 um 11.30.08.jpg

Bildschirmfoto 2025-06-06 um 11.30.46.jpg

Bildschirmfoto 2025-06-06 um 11.31.03.jpg

Bildschirmfoto 2025-06-06 um 11.31.43.jpg