# Integration of Mennekes ACU charging station into the Eponet portal

These instructions are step 3 for connecting a Mennekes AC charging station to the Eponet portal.

Step 1 can be found at this link: [Basic instructions for integrating charging stations](https://wiki.eponet.ch/books/ladestationen/page/schritt-1-konto-vorbereiten-allgemeiner-schritt)

<table border="1" id="bkmrk-software-versionen-z" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 37.3063%;"></col><col style="width: 62.6937%;"></col></colgroup><tbody><tr><td>[![mennekes-slide-2-3285424422.jpg](https://wiki.eponet.ch/uploads/images/gallery/2025-11/scaled-1680-/mennekes-slide-2-3285424422.jpg)](https://wiki.eponet.ch/uploads/images/gallery/2025-11/mennekes-slide-2-3285424422.jpg)

</td><td style="border-color: rgb(255, 255, 255);">  
</td></tr></tbody></table>

First, connect to the ACU, which is located inside the charging station, using a cable.

After logging in, set up the charging station as shown in the following images.

[![grafik-20251029-093126.png](https://wiki.eponet.ch/uploads/images/gallery/2025-11/scaled-1680-/grafik-20251029-093126.png)](https://wiki.eponet.ch/uploads/images/gallery/2025-11/grafik-20251029-093126.png)

[![grafik-20251029-092856.png](https://wiki.eponet.ch/uploads/images/gallery/2025-11/scaled-1680-/grafik-20251029-092856.png)](https://wiki.eponet.ch/uploads/images/gallery/2025-11/grafik-20251029-092856.png)

wss://ocpp.eponet.io/1.6J/FA61/

Then save the settings and restart the charging station. Under "Info" you can see whether the charging station has successfully established a connection to the Eponet backend.

[![grafik.png](https://wiki.eponet.ch/uploads/images/gallery/2025-12/scaled-1680-/grafik.png)](https://wiki.eponet.ch/uploads/images/gallery/2025-12/grafik.png)

This should bring the charging station online on the Eponet portal.

Note:

If the connection cannot be established, you can only use "ws":

<span lang="EN-GB" style="mso-ansi-language: EN-GB;">ws://ocpp.eponet.io/1.6J/FA61/</span>

The reason for this is that the controllers only support TLS 1.0 because an older operating system is installed that cannot be updated via a firmware update.  
If a secure "wss" connection is required, this can only be implemented on site using a special Mennekes update (software update 2.15 including update to TLS 1.2).

**Checklist:**

- Software checked / latest version?
- Internet configured / online?
- OCPP server: Eponet link set up and charging station online on the Eponet portal?

[Now continue with step 4.](https://wiki.eponet.ch/books/ladestationen/page/schritt-4-ladegerat-hinzufugen-allgemeiner-schritt)